{"id":1371,"date":"2011-06-14T07:41:44","date_gmt":"2011-06-14T12:41:44","guid":{"rendered":"http:\/\/www.watermarklearning.com\/blog\/?p=1371"},"modified":"2022-08-04T11:02:14","modified_gmt":"2022-08-04T16:02:14","slug":"project-risks-so-what","status":"publish","type":"post","link":"https:\/\/www.watermarklearning.com\/blog\/project-risks-so-what\/","title":{"rendered":"Project Risks? So What?"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-1386 size-full\" title=\"So_What\" src=\"https:\/\/www.watermarklearning.com\/blog\/wp-content\/uploads\/2011\/06\/So_What.jpg\" alt=\"So What?\" width=\"160\" height=\"148\">In my last ProjectBrief <a href=\"https:\/\/www.watermarklearning.com\/blog\/what-is-a-risk\/\">post<\/a>, I talked about the importance of clearly identifying risks as events and making sure they aren\u2019t simply stated as facts. &nbsp;Here I\u2019d like to briefly highlight the importance of including the consequence of those identified risks in the risk register.<\/p>\n<p>Risk registers often include risks with little or no indication as to the consequence. Take a look at the register below, for example:<\/p>\n<table border=\"0\" width=\"646\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td width=\"356\"><strong>Risk Event<\/strong><\/td>\n<td width=\"90\"><strong>Prob 1-5<\/strong><\/td>\n<td width=\"100\"><strong>Impact 1-5<\/strong><\/td>\n<td width=\"100\"><strong>Risk Score PxI<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"356\">Scheduling classes on new site fails to work with the ISP\u2019s new online scheduling services when going live.<\/td>\n<td width=\"90\"><strong>3<\/strong><\/td>\n<td width=\"100\"><strong>5<\/strong><\/td>\n<td width=\"100\"><strong>15<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"middle\" width=\"356\" height=\"30\">Doug leaves project.<\/td>\n<td width=\"90\"><strong>2<\/strong><\/td>\n<td width=\"100\"><strong>5<\/strong><\/td>\n<td width=\"100\"><strong>10<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These are clearly articulated as risk events, so that\u2019s good.&nbsp; But if I hadn\u2019t been in the risk identification session when these got added to the register, I\u2019m left with a lot of questions, most notably \u201cSo what?\u201d<\/p>\n<p>Let\u2019s take the first one, Scheduling classes on new site fails\u2026when going live.&nbsp; And?&nbsp; It looks like it would be a pretty bad thing, but why?&nbsp; Or what about Doug leaving?&nbsp; Who is Doug and why do I care if he leaves?<\/p>\n<p>A solid risk register tells the reader why they should be concerned about the events.&nbsp; Add the consequence or impact of the risk to the register:<\/p>\n<table border=\"0\" width=\"646\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td width=\"356\"><strong>Risk Event<\/strong><\/td>\n<td width=\"90\"><strong>Prob 1-5<\/strong><\/td>\n<td width=\"100\"><strong>Impact 1-5<\/strong><\/td>\n<td width=\"100\"><strong>Risk Score PxI<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"356\">Scheduling classes on new site fails to work with the ISP\u2019s new online scheduling services when going live. <strong>Impact: This would prevent customers from scheduling classes and sending payment.<\/strong><\/td>\n<td width=\"90\"><strong>3<\/strong><\/td>\n<td width=\"100\"><strong>5<\/strong><\/td>\n<td width=\"100\"><strong>15<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"middle\" width=\"356\" height=\"75\">Doug leaves project. <strong><strong>Impact: Project would completely stall as he is the only resource on staff with the skills needed for the project work.<\/strong><\/strong><\/td>\n<td width=\"90\"><strong>2<\/strong><\/td>\n<td width=\"100\"><strong>5<\/strong><\/td>\n<td width=\"100\"><strong>10<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Now I understand and the impact rating of \u201c5\u201d makes total sense.<\/p>\n<p>A good test for a risk register might be to give it to someone who hasn\u2019t been involved in the project and see if they understand it. &nbsp;Is it clear what the potential events are and do they have a sense for why those events matter?<\/p>\n<p>I\u2019m not really suggesting that you do that. In fact, we may use some discretion as to which stakeholders are privy to the project risk register.&nbsp; But project stakeholders who are involved in risk management activities shouldn\u2019t have to guess at the consequence of these events.&nbsp; No one should be asking \u201cSo?\u201d<\/p>\n<p>Improving the quality of our register by clearly communicating both what the risks events are <em>and<\/em> what their impact would be helps ensure that our registers doesn\u2019t get ignored as we move through the project. It\u2019s easy to get excited about creating the initial register, but as the day-to-day project grind wears us down, if we aren\u2019t reminded of the consequence of these events, it\u2019s equally easy to put that register on a shelf and eventually forget about it.<\/p>\n<p>Risk registers that sit on a back shelf and collect dust during a project\u2019s life cycle can result in more issue management down the road, which is often a lot more costly than dealing with the risks proactively before they happen.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In my last ProjectBrief post, I talked about the importance of clearly identifying risks as events and making sure they aren\u2019t simply stated as facts. &nbsp;Here I\u2019d like to briefly highlight the importance of including the consequence of those identified risks in the risk register. Risk registers often include risks with little or no indication [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":10779,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[211,12,1],"tags":[22,68],"coauthors":[140],"class_list":["post-1371","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-risk","category-watermark-learning","tag-project-management","tag-project-risk-management"],"_links":{"self":[{"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/posts\/1371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/comments?post=1371"}],"version-history":[{"count":2,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/posts\/1371\/revisions"}],"predecessor-version":[{"id":10780,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/posts\/1371\/revisions\/10780"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/media\/10779"}],"wp:attachment":[{"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/media?parent=1371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/categories?post=1371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/tags?post=1371"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.watermarklearning.com\/blog\/wp-json\/wp\/v2\/coauthors?post=1371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}